Entrusted by Jinan Branch of China Petroleum & Chemical Corporation, the invitation injection of ammonia injection grille, rectification grille, and deflector for the 1.4 million-ton/year catalytic cracker flue gas denitration project was invited. This announcement is issued today. Qualified bidders are invited to register. Terminal Blocks
There are 10 series of products,with over 1,100 types and 12,000 models of terminal blocks. We have many types of Terminal Blocks , such as Pluggable Terminal Blocks ,PCB Universal Screw Terminal Blocks,PCB Spring Terminal Blocks, Transformer Terminal Blocks,Through-Wall Terminal Blocks, Interface Module ,Feed-Through Terminal Blocks, Barrier Terminal Blocks , Din-Rail Terminal Blocks and Terminal Blocks Independent Parts.Our products have been approved by UL,VDE,TUV,EXCE,CQC,RoHS,REACH.
Terminal Blocks,Cable Connector Block,Terminal Block Connector,PCB Terminal Block Connector Suzhou WeBest Electronics Technology Co.Ltd , https://www.webestet.com
SINOPEC Petrochemical Co., Ltd. Jinan Branch 1.4 million-ton/year catalytic cracker flue gas denitrification project Ammonia spraying grid, rectifier grille, and deflector
1. Tender number: WZ20161117-4805-1747-B1
2. Project Content: 1.4 million tons/year catalytic cracker flue gas denitrification project
Project Overview: The project has passed the approval and the funds have been implemented.
3. Name and quantity of tender materials:
No. Quantity Unit of measure
1 deflector 3000×4870 Q345B 2.0 sets
2 Ammonia spraying grid 4870×1400×3500 12Cr1MoV 2.0 sets
3 deflector 1238×4870 Q345B 2.0 sets
4 deflector 1800×4870 Q345B 2.0 sets
5 rectifier grilles 4870×3800 Q345B 2.0 sets
4. Delivery date and place: February 20, 2017, Jinan
5. Bidder's basic qualification requirements:
5.1 Have the right to independently conclude the contract and the ability to perform the contract, obtain a business license in accordance with the law, business license is in its valid period, business license, tax registration certificate, organization code certificate is complete legal person or other organization with complete three certificates.
5.2. For VAT general taxpayers, there were no illegal records in other procurement activities attended in the past three years.
5.3 With the required material supply capacity and quality control measures, no significant quality problems have occurred during the use of the products provided in the past three years.
5.4 has a good business reputation, a sound financial accounting system, financial status and market behavior is good. It is not under the authority of the competent authority to revoke the business license, revoke the qualifications, suspend business for rectification, cancel the qualifications for the bid, and the property is taken over, frozen, or enter bankruptcy procedures.
5.5 There is no state in which Sinopec Corp. has been suspended from trading due to breach of contract or other reasons.
6. Other major qualification requirements:
6.1 Requirements The bidder must process the catalytic cracker regeneration flue gas and the internal components of the flue gas denitrification device of the coal-fired boiler, including the ammonia injection grille, the rectifier grille and the deflector (provide a clear and identifiable copy of the contract)
6.2 1 The ammonia injection grid shall ensure uniform mixing of flue gas and ammonia gas. The deviation of NH3 distribution at the entrance of the catalyst bed of the first layer of the denitration reactor is less than ± 5%, and the ammonia slip is less than 1.0 mg/Nm3. 2 The deflector shall ensure that the smoke flow field is uniform and stable, and the flue gas is in a laminar state. (3) The rectifier grille shall ensure that the flue gas flow at the inlet of the catalyst bed of the denitration reactor is stable and the flow field is distributed uniformly. The absolute velocity deviation of the flue gas at the entrance of the first layer of the denitrification reactor is less than ±10%, and the flue gas flow is perpendicular to the bed. Flow deviation is less than ±10°.
6.3 The bidder shall provide complete sets of equipment to take over the flange and its mating flanges, gaskets and bolts.
6.4 The nozzles of the equipment are flanged, and the flanges and sealing surfaces are made of SH3406-2013 "Petrochemical Steel Pipe Flanges".
6.5 The service life of the ammonia injection grille, deflector and rectifier grille is not less than 20 years.
6.6 Smooth and normal operation, no impact, vibration and abnormal noise.
6.7 All purchased parts and collaborating parts must have a certificate of conformity and they can be assembled only after being inspected by the inspection department.
6.8 The material of the part is qualified. Otherwise, the bidder shall provide the qualification certificate of the qualified third party for testing and testing.
6.9 Affirmation documents for the stable operation of ammonia-sprayed grids, rectification grids and deflectors in catalytic cracking flue gas denitration units for more than 2 years.
7. Comply with other conditions stipulated by laws and regulations.
8. Detailed requirements are detailed in the bidding documents.
9. This tender accepts the application from the manufacturer (manufacturer), does not accept the agent's bid, and does not accept the distributor's bid.
10. The tender does not accept the consortium bid.
11. Evaluation method: The lowest tender price method that has been evaluated.
12. The cost of bidding documents: The bidding documents cost 1,000 yuan, which is purchased online and the tender documents are not refundable after sale.