1. This process standard is applicable to the installation of substation reactors; 2. Citation standard: "Code for construction and acceptance of high-voltage electrical installations for electrical installations GBJ147-90" Second, installation technical measures 1, out of the box inspection After the equipment is unpacked, the following visual inspections should be carried out first: the pillars and coil insulation should be free from serious damage and cracks; the coils should be free of deformation, and the pillar insulators and other accessories should be complete. Check the protective paint on the external surface of the reactor for scratches. If there is any scratch, contact the manufacturer. Do not brush ordinary paint. 2, preparation work (1) Check the verticality and levelness of the support bracket; (2) Check the size and hole spacing of the base of the reactor should be the same; (3) Clean the reactor and require no stain on the surface. Check the gap in the reactor for no debris, especially metal objects. (4) Find the phase sequence of the reactor to be installed according to the phase sequence of the design. The numbers of the same reactor should be the same. 3. Installation measures (1) Reactors shall be installed according to their number and meet the following requirements: 1 When the three phases are vertically aligned, the winding of the middle one-phase coil should be opposite to the upper and lower phases. 2 When two phases overlap and one phase is juxtaposed, the overlapping two phases are wound in opposite directions, and the other phase is wound in the same direction as the upper phase. 3 When the three phases are horizontally aligned, the three-phase winding should be the same. (2) The post insulator and the raised seat can be assembled on the ground in advance, so that the strut insulator and the raised seat are on the same straight line, and rubber pads should be added on both sides of the post insulator. (3) Use a 5 ton shackle to hang on the four hanging points on the reactor star frame and hoist with a 3 m φ18 wire rope. (4) When installing, the reactor should be lifted off the ground, the height is slightly higher than the total height of the post insulator and the raised seat, then the post insulator and the riser are installed, and the bolt should be pre-tightened. Note that rubber pads should be installed on both sides of the post insulator, and all bolts should be made of anti-magnetic stainless steel bolts. (5) Lift the reactor to the assembled bracket and remove the shackle for lifting. (6) Adjust the verticality of the post insulator, and finally weld the bottom of the riser to the bracket. (7) Assemble the umbrella on the ground and hoist it to the reactor. (8) When the upper and lower overlap installation, all the pillar insulators of the bottom layer should be grounded, and the remaining pillar insulators are not grounded; when each phase is separately installed, each phase pillar insulator should be grounded, and the grounding wire cannot form a closed loop. Third, tools According to the specific project Fourth, personnel organization (configuration and number of people) According to the specific project Five, safety precautions 1. When hoisting, it is strictly forbidden to stand under the crane boom and the suspended object. 2. All personnel cannot enter the bottom of the reactor when lifting. 3. All tools must be stable during installation. Prevent the tool from slipping when bolting to prevent damage to the porcelain. 4. Check the internal clearance of the reactor without any debris.
High efficient charging speed for Acer laptop, stable current outlet can offer power for the laptop at the same time charge the laptop battery. The best choice for your replacement adapter. The DC connector is 5.5*1.7mm or 3.3*1.0mm. We can meet your specific requirement of the products, like label design. The plug type is US/UK/AU/EU. The material of this product is PC+ABS. All condition of our product is 100% brand new.
Our products built with input/output overvoltage protection, input/output overcurrent protection, over temperature protection, over power protection and short circuit protection. You can send more details of this product, so that we can offer best service to you!
Laptop Adapter For Acer,Charger For Acer,Acer Laptop Adapter ,Ac Adapter For Acer Shenzhen Waweis Technology Co., Ltd. , https://www.szwaweischarger.com
Low piezoelectric reactor installation process
I. Overview